Study Guide
The high-yield checklist. Every fact below shows up somewhere in the exam. Open book is allowed; this is meant to be your study reference.
Why Metal America
- We keep it simple, we keep it fast, and we are American-made, with the best customer service in the industry.
- One locked price from the day you sign. No change orders, ever.
- One team, one contract: engineering, foundation, shell, interior, finishes, and keys.
- 14-gauge galvanized steel frame: stronger and more durable than stick-built, and cheaper to insure.
- 9 months or less from signed contract to keys, not the 18 to 24 you get everywhere else.
- Built-in equity: barndos are appraising above what clients pay to build them.
- Finishes from brands you already know: Sherwin-Williams, Kohler, GE, Anderson, and more.
- Lead with this when a customer or realtor asks why us over a competitor.
Materials & Engineering
- 14 gauge galvanized steel frame (customer-facing language)
- 26 gauge sheet metal panels
- 4 ft on center spacing (always)
- Insulation: cavity/batt + spray foam (we do not use double bubble)
- 140 MPH wind / 30 PSF snow standard rating
- Site-specific engineering required for all habitable structures (Risk Cat II)
- Risk Cat II = habitable, ALWAYS requires site-specific drawings
- Construction documents are complete, ready to ship. Not in progress.
Build Process & Timelines
- Phases: site prep, foundation, steel erection, exterior envelope, interior framing, drywall/paint, finish-out, final
- Steel shell goes up in 3-7 days. Steel supplier crews (Eagle, Star) erect, NOT the GC.
- Total turnkey timeline: 9 months max from signed contract for any deal.
- Concrete must cure before steel arrives
- Slab-on-grade per engineered plans. Monolithic slab is standard. No basements.
- Foundation can include a notched / brick ledge edge when the build calls for it.
Codes & Compliance
- All Metal America designs are built to code and meet or exceed all compliance expectations for a habitable structure.
- You do not need to memorize opening sizes or the window catalog. Just know every build is code-compliant.
- HOA prohibits metal siding = deal is DEAD. Politely decline and move on. No workaround, no off-spec build.
Standard Builds
- 3 standard builds × 3 floor plans each = 9 total SKUs
- Armani (flagship, ~2,800 sqft): 3BR/2BA or 4BR/3BA layout options
- Ol' Smokey (entry, ~1,200 sqft)
- Full House (family, ~1,900 sqft)
- More standard builds and floor plans are coming soon.
- We do NOT offer basements or fireplaces in any standard build
- We do NOT offer custom designs. Always pitch one of the 9 standard plans.
Service Area
- Texas and Oklahoma: turnkey only. Metal America delivers a finished home, start to keys.
- We sell turnkey only. We do not do shell-only builds or out-of-area finish-out deals.
Pricing & Payments
- Project setup fee = 10% of total project cost, charged upfront at start
- Cash deal: 50% upfront / 40% on shell delivery / 10% on final walkthrough
- Financed (Guild): customer experiences a single Guild closing. The 33%/67% split is internal to how MA gets paid and is not customer-facing.
- All money flows through Metal America. Customer NEVER pays the GC directly.
- Sales rep commission: paid when the customer's first payment hits Metal America (that's when the deal is marked sold).
- Realtor commission: 3% of the deal, paid the same way (when first payment hits MA).
Financing
- Guild Mortgage = our ONLY financing partner. One-Time Close construction-to-permanent loan.
- Single closing. No separate refinance after construction.
- Guild requires GC with 3+ years residential experience, GC of record. Metal America provides the qualified GC.
- We do NOT coordinate with USDA, FHA, conventional, RTO, Hearth, HFS, or any other lender.
- Outside lender = cash deal from our perspective. Customer pays us directly.
- Appraisal comp problem is the #1 deal killer. Build comp database long term.
Why We Use One Financing Partner
- Realtors will want to use their own lender. Frame our single partner as the advantage it is.
- Our preferred lender already knows Metal America's building process from start to finish.
- Our floor plans, specifications, contractors, and construction draw schedule are already on file and approved.
- They understand barndominium construction, which avoids unnecessary delays and confusion.
- Communication between builder, lender, and borrower is streamlined, creating a smoother experience for everyone.
- The result: faster approvals, fewer underwriting issues, and a higher likelihood of closing successfully.
- Can my client use their own lender? Yes, but when a client chooses a different lender, Metal America treats the project as a cash transaction. We do not coordinate with outside lenders because each one has different underwriting, draw schedules, documentation, and approval processes. Working with our preferred partner removes those variables for a much more efficient build.
What Metal America Handles vs. The Customer
- MA handles: engineering, drawings, materials, shell erection, concrete, site prep, utilities, finish-out, payments, and GC of record on financed deals.
- Customer handles: legal access to the build site, HOA approvals, and any custom upgrades outside the 9 SKUs (we won't do them).
Sales Flow
- 1. Build the Quote: create a turnkey proposal using our quoting tool.
- 2. Submit for Approval: our team reviews the quote and coordinates financing if needed.
- 3. Close the Sale: obtain the customer's signature on the final agreement.
- 4. Get Paid: once construction begins and the first payment draw is received, your commission is paid.
The Finish Package (high level)
- Every Metal America build comes with a curated, pre-selected Foundation finish package — flooring, cabinets, countertops, fixtures, paint, appliances, HVAC, all of it.
- Why pre-selected? It eliminates decision paralysis, keeps the price predictable, and gets the customer into a finished home faster.
- Customers can swap to the Upgrade tier on a few line items if they want more (e.g. premium appliance package, alternate flooring lines, fancier shower tile).
- The exam does NOT test brand-by-brand recall. For full SKUs, brand names, and pricing reference the separate Finish Guide (link below).
Common Deal Killers
- HOA prohibits metal siding — deal is dead, no workaround.
- Customer wants a basement or fireplace — not offered, redirect to a standard build.
- Customer wants a custom design — not offered, pitch one of the 9 SKUs.
- Outside lender (USDA / FHA / conventional / RTO / Hearth / HFS) — treat as cash deal, MA does not coordinate.
- Appraisal comp problem on financed deals — biggest single risk to closing.
Competitive Advantage
- Simple, fast, American-made, best customer service in the industry.
- In-house architecture team = days, not weeks for design changes.
- Pre-selected curated finishes = no decision paralysis for the customer.
- Guild One-Time Close financing partnership = single closing, no refinance.
- Steel is 25 to 75% cheaper to insure than wood frame.
The Metal America Difference
- When asked how we compare to other builders, here is the honest answer.
- vs. Kit Builders: kit builders sell you a steel shell. You still hire a GC, coordinate subs, manage the job site, and make every finish decision yourself. Metal America sells a finished, turnkey home. One price, one team, and we hand you the keys.
- vs. Fully Custom Builders: fully custom means many vendors, many invoices, and change orders that bleed you for months. Budget overruns are baked into that model. Metal America is semi-custom by design. You get the personalization without the chaos, and you are done in 9 months instead of 24.
- vs. Stick-Built Homes: wood frames rot, warp, attract pests, and burn. Steel does not. Metal America clients pay 25 to 75% less to insure their home for its entire life, the home is stronger, and the appraisal often comes in above what you paid to build.